How Long Does a Home Renovation Take?

Home renovation is one of the most exciting and transformative projects homeowners can undertake. Whether you’re upgrading a single room or remodeling your entire house, renovation gives your living space a fresh look, improves comfort, and often boosts property value.

However, one of the biggest questions people ask before starting is: “How long will it take?”

The duration of a home renovation depends on a variety of factors – from the scope of work, size of the house, complexity of design, materials availability, and even the season you choose to start in.

In this article, we’ll break down all the factors that influence renovation timelines, look at typical timeframes for different types of renovations, and offer tips to help you plan efficiently and avoid delays.

House Renovation

Understanding the Home Renovation Process

Before discussing the timeframe, it’s important to understand the stages involved in most home renovations. Every project, whether small or large, usually follows these core steps:

1. Planning and Design

This is when you decide what you want to achieve – creating design concepts, choosing materials, setting a budget, and hiring professionals.
Estimated time: 2-8 weeks.

2. Obtaining Permits and Approvals

Many renovations, especially structural ones, require official permits from your local authorities. The approval time can vary widely depending on the complexity of your project and your location.
Estimated time: 2-12 weeks.

3. Demolition

Old fixtures, walls, flooring, and cabinets are removed to make way for the new design.
Estimated time: 1-2 weeks.

4. Structural Work and Rough-In

This stage includes plumbing, electrical, and framing – essentially everything that goes “behind the walls.”
Estimated time: 2-4 weeks.

5. Interior Finishes

Once the structure is ready, contractors move on to visible features – flooring, painting, cabinetry, lighting, and fixtures.
Estimated time: 4-8 weeks.

6. Final Touches and Inspection

The last step includes detailed finishing work, deep cleaning, and final inspections to ensure everything meets code and your expectations.
Estimated time: 1-2 weeks.

Related Articles:

Average Timeframes for Common Types of Home Renovations

Not all renovations are created equal. The timeline depends largely on which part of the home you’re remodeling and how extensive the changes are.

1. Cosmetic or Surface Renovations

If you’re only refreshing your home with paint, minor repairs, or simple décor updates, your project will be relatively quick.
Examples include:

  • Painting walls or ceilings
  • Changing light fixtures
  • Replacing cabinet handles
  • Updating window treatments

Average duration: 3 days to 2 weeks

These updates are often DIY-friendly and don’t usually require building permits.

Home Renovation

2. Kitchen Renovation

The kitchen is one of the most complex spaces to renovate because it involves plumbing, electrical work, cabinetry, and countertops – all of which must align perfectly.

Typical timeline:

  • Design & planning: 2-4 weeks
  • Demolition: 1 week
  • Rough-ins (plumbing, wiring): 1-2 weeks
  • Cabinet installation: 2-4 weeks
  • Countertops, flooring, paint, and finishing touches: 1-3 weeks

Total: 6 to 12 weeks

Tip: Custom cabinetry and imported materials can extend the timeline significantly, sometimes up to 16 weeks or more.

3. Bathroom Renovation 

Bathrooms are smaller but still require multiple trades – plumbing, tiling, waterproofing, and electrical – which means coordination is key.

Typical breakdown:

  • Design and selection of materials: 2-3 weeks
  • Demolition and prep: 1 week
  • Plumbing and electrical rough-in: 1-2 weeks
  • Tiling and finishes: 2-3 weeks
  • Fixtures and final touches: 1 week

Total: 4 to 8 weeks

Delays often occur if you’re waiting for tiles, vanities, or specialty fixtures to arrive.

4. Whole-Home Renovation 

Renovating an entire house – especially older homes – can be a lengthy process. It involves multiple rooms, systems, and sometimes even structural changes.

Typical phases include:

  • Design and permits: 2-4 months
  • Demolition and framing: 1-2 months
  • Plumbing, electrical, HVAC work: 1-2 months
  • Finishing and interior work: 2-4 months

Total: 3 to 12 months, depending on the size and scope.
If you’re adding new rooms or extensions, expect to be closer to the longer end of the range.

5. Room Addition or Extension

Adding a new bedroom, bathroom, or sunroom involves foundation work, roofing, plumbing, and insulation – almost like building a mini-house.

Stages include:

  • Design and permitting: 2-3 months
  • Site prep and foundation: 1 month
  • Framing and structural work: 1-2 months
  • Interior finishing: 2-3 months

Total: 4 to 9 months

Weather, soil conditions, and local permit approvals can also extend the timeline.

6. Basement Renovation

Transforming a basement into a livable area – such as a family room or rental suite – takes time because of moisture concerns, insulation, and proper ventilation.

Average duration: 8-16 weeks
If the basement needs waterproofing or structural repairs, add another month or two.

7. Exterior Renovation 

Exterior updates like roofing, siding, windows, or decks can vary greatly depending on the weather and contractor availability.

Average duration:

  • Roof replacement: 1-3 weeks
  • Siding or exterior paint: 2-6 weeks
  • Deck or patio construction: 4-8 weeks

Seasonal conditions – especially rain or cold weather – can slow progress.

Tip – If you’re ready to begin your renovation journey, consulting with home renovation experts at Housemill Design can make all the difference. Our experienced team helps you craft a beautiful, functional space – on time and within budget.

Factors That Affect Renovation Timelines

Every renovation is unique, and several variables can influence how long it takes to finish your project.

1. Project Size and Scope

A small bathroom remodel will obviously finish faster than a whole-home overhaul. The more rooms or systems you upgrade, the more coordination is needed among trades.

2. Permit and Inspection Delays

Municipal approvals can take weeks or even months. Some projects can’t progress until each stage passes inspection.

3. Material Availability

Special-order items, imported tiles, or custom cabinetry can cause delays if there are shipping or production issues.

4. Contractor Scheduling

Good contractors are often booked months in advance. Scheduling conflicts between electricians, plumbers, and carpenters can extend your project.

Consider consulting with Housemill Design for expert design and renovation planning.

5. Structural Surprises

Older homes may hide problems like water damage, mold, outdated wiring, or weak foundations that only become visible during demolition.

6. Homeowner Changes

Last-minute design changes or new requests during construction can delay progress and increase costs.

7. Weather Conditions

Rain, snow, or extreme temperatures can stall exterior or structural work, especially roofing or foundation projects.

How to Plan and Manage Renovation Time Efficiently

Proper planning can make or break your renovation schedule. Here are some expert tips to help your project stay on track:

1. Finalize Your Design Early

Lock in design choices before construction starts. Constantly changing materials or layouts mid-project is one of the biggest causes of delay.

2. Order Materials in Advance

Buy or reserve key materials early – especially appliances, tiles, and cabinetry – so they arrive before they’re needed.

3. Hire Experienced Renovation Professionals

A skilled contractor with strong project management experience can keep trades aligned and the schedule realistic.

4. Build in Buffer Time

Always expect the unexpected. Add at least 10-20% extra time to your planned schedule for unforeseen issues.

5. Communicate Frequently

Regular updates between you and your contractor prevent misunderstandings and help identify potential bottlenecks early.

6. Avoid Major Renovations During Peak Seasons

Spring and summer are high-demand periods for builders. Starting in the off-season (fall or winter) may get you faster scheduling and even cost savings.

Conclusion

So, how long does a home renovation take?
It depends – but most projects range from a few weeks to several months, depending on size, complexity, and preparation.

The key to a successful and timely renovation lies in thorough planning, realistic expectations, and consistent communication with your contractor.

The Journal

Share:

Leave a Reply

Your email address will not be published. Required fields are marked *

Be the first to get our Designer Tips, Tricks and Trends!

Come see our founders' personal home at the NARI TOUR OF REMODELED HOMES
 Sept 7-8th

GET TICKETS FOR THE TOUR!

Submit

Be the first to get our Designer Tips, Tricks and Trends!